Sunshine Coast, QLD
Category:
Other
9

Nick Johnson


Victor Cruz
Plumber
This job shows the standard we bring to every site — clean, compliant, and on schedule
Project gallery

Key Areas
Drainage:
Sewer and stormwater pipes laid in trenches to the correct fall, joined with the right fittings and tested before backfilling.
Rough-In:
Hot and cold water lines and waste pipes run through the timber frame and clipped in place, ready for the wall linings.
Fit-Off:
Vanities, toilets, showers and tapware fitted once the walls were finished, then run with water to check for leaks and flow.
Details
Pipework
Copper and PEX water lines and PVC drainage, sized for the house and supported along every run.
Stage Testing
Drains and water lines tested at each stage, before the trenches were filled and the walls were lined.
Working with the Builder
Each stage timed to the builder’s program, so framing, linings and tiling went ahead without waiting on plumbing.
Final Checks
Every tap, toilet and waste checked for leaks and flow before the house was handed over.